
Temporary plug is established below the packer by dropping a ball down the tubing string and allowing it to fall to the seat contained in the pump out plug. The required packer setting pressure is applied and held for the time required for the specific packer application. After the packer has been set, tubing pressure is increased to shear the pins retaining the ball seat. The ball and seat fall to the bottom of the well, leaving the pump plug housing with a fully open tubing ID.
• Adjustable shear value
• Full-bore after activation
• Available in standard and premium materials
• Optional bronze or phenolic ball

Other sizes, connections, material and rubber options available upon request.